Calumet arrived on Saturday morning, calling on the Burroughs North dock in Essexville, to unload. She was followed a short time later by the Olive L. Moore - Lewis J. Kuber, who traveled upriver to unload at the Saginaw Wirt Stone dock. Both were able to finish unloading and make it out of the Saginaw River before the storm front came in and high southerly winds dropped water levels to an unsafe level.
No comments:
Post a Comment